Electricity
|
The District gets poor supply of electricity, despite the fact that 66 % (1197.50 Mega watts) of the entire production of electricity in the State of 1812.9 Mega watts, is produced in 8 Electricity Projects located in the District. The major producer being from Idukki with 780 Mega watts. Out of 3.5 lakhs houses only 25,603 houses (35.8%) have only been electrified as against the State average of 46%. |
![]() |
| Name of Project | Year Started | Installed Capacity (MW) | Annual Production (Million Units) |
| Pallivasal | 1940 | 37.5 | 284 | Chenkulam | 1954 | 48 | 182 | Neerimangalam | 1961 | 48 | 237 | Panniyar | 1963 | 30 | 158 | Idukki | 1976 | 780 | 2398 | Edamalayar | 1987 | 75 | 380 | Lower Periyar | 1997 | 180 | 493 |
| Mattupetty | 1998 | 2 | 6.36 |
| Total | 1197.5 | 4138.36 |
|
|
|
|